Gratuit

CN 7308

Structures and parts of structures "e.g., bridges and bridge-sections, lock-gates, towers, lattice masts, roofs, roofing frameworks, doors and windows and their frames and thresholds for doors, shutters, balustrades, pillars and columns", of iron or steel; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, of iron or steel (excl. prefabricated buildings of heading 9406)

✓ Couvert par le MACF Iron and steel

Aperçu du coût CBAM

Prix ETS actuel : 76.15 €/t CO₂. Exemple : 1 tonne de NC 7308 aux facteurs par défaut coûte ~48.05 € en certificats CBAM aujourd'hui.

Émissions directes
6.035 t CO₂/t
Émissions indirectes
0.275 t CO₂/t
CBAM cost (1000 t shipment)
€48,051
Comment est-ce calculé ?

Coût certificat CBAM = émissions intégrées × prix ETS × (1 − facteur de quotas gratuits) × majoration de phase.

Phase-in 2026: 10% of full certificate cost. Free allocation assumed 0% in this preview.

Calculer mon coût CBAM →

Émissions intégrées par défaut

Lorsque vous ne pouvez pas obtenir de données fournisseurs vérifiées, l'UE autorise l'usage de ces valeurs par défaut pour le secteur Iron and steel.

OrigineÉmissions directesÉmissions indirectesTotal
China6.0356.035
Türkiye5.525.52
Indonesia8.258.25
India5.935.93
Kazakhstan5.365.36

t CO₂e par tonne de produit. Source: EU Implementing Reg. 2025/2621 Annex IV.

Principaux exportateurs vers l'UE

Eurostat Comext, dernière année disponible. Les volumes affichés sont les importations extra-UE (tonnes).

OrigineTonnes / anPart
China880,00073%
Türkiye320,00027%

Source: Eurostat Comext annual extra-EU trade.

Comment se conformer pour ce code

Revu par l'équipe AutoCBAM — mis à jour 2026-04-28.

Methodology guide -- CN 7308 (structures and parts of structures)

CN 7308 covers prefabricated structural steel: industrial buildings, towers, masts, gates, fences, scaffolding. Chinese fabricators dominate EU imports.

Step 1 -- understand the upstream / fabrication split. Structural fabrication (cutting, drilling, welding, painting) adds <0.1 t CO2/t to the upstream steel. The dominant emissions come from the upstream hot-rolled section, plate or tube.

Step 2 -- request the full chain verification. Fabricators must pass through upstream steel emissions. A fabricator-only emissions report is insufficient.

Step 3 -- handle paint and galvanising correctly. Coatings on structural steel are excluded from CBAM mass. Subtract before applying the emissions factor.

Step 4 -- monitor large-project imports. A 10,000-tonne industrial building import at €0.85/tonne CBAM in 2026 = €8,500. Same project at €8.5/tonne in 2034 = €85,000. Build CBAM into multi-year project budgets.

Questions fréquentes

What is CN 7308?
Structures and parts of structures of iron or steel -- bridges, towers, lattice masts, prefabricated buildings, doors, windows.
Why is CN 7308 so high-volume in CBAM?
Industrial structures (industrial buildings, towers, telecom masts) are exported to the EU at scale. Chinese supply dominates (~880kt/yr).

Recevoir un rapport coût-émissions

PDF gratuit avec les valeurs par défaut, les 3 principaux pays d'origine et une prévision de coût liée à l'ETS pour NC 7308.

Données de référence uniquement — la portée CBAM dépend de la déclaration TARIC et des dernières modifications de l'Annexe I.