Structures and parts of structures "e.g., bridges and bridge-sections, lock-gates, towers, lattice masts, roofs, roofing frameworks, doors and windows and their frames and thresholds for doors, shutters, balustrades, pillars and columns", of iron or steel; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, of iron or steel (excl. prefabricated buildings of heading 9406)
✓ In scope of CBAM Iron and steel
CBAM cost preview
Live ETS price: €76.15/t CO₂. Sample: 1 tonne of CN 7308 at default factors costs ~€48.05 in CBAM certificates today.
- Direct emissions
- 6.035 t CO₂/t
- Indirect emissions
- 0.275 t CO₂/t
- CBAM cost (1000 t shipment)
- €48,051
How is this calculated?
CBAM certificate cost = embedded emissions × ETS price × (1 − free-allocation factor) × phase-in markup.
Phase-in 2026: 10% of full certificate cost. Free allocation
assumed 0% in this preview.
Calculate my CBAM cost → Default embedded emissions
When you cannot collect verified supplier data, the EU lets you use these default values for the Iron and steel sector.
| Origin | Direct emissions | Indirect emissions | Total |
|---|
| China | 6.035 | — | 6.035 |
| Türkiye | 5.52 | — | 5.52 |
| Indonesia | 8.25 | — | 8.25 |
| India | 5.93 | — | 5.93 |
| Kazakhstan | 5.36 | — | 5.36 |
t CO₂e per tonne of product. Source: EU Implementing Reg. 2025/2621 Annex IV.
Top exporters into the EU
Eurostat Comext, latest available year. Volumes shown are extra-EU imports (tonnes).
| Origin | Tonnes / yr | Share |
|---|
| China | 880,000 | 73% |
| Türkiye | 320,000 | 27% |
Source: Eurostat Comext annual extra-EU trade.
How to comply for this code
Reviewed by AutoCBAM team — last updated 2026-04-28.
Methodology guide -- CN 7308 (structures and parts of structures)
CN 7308 covers prefabricated structural steel: industrial buildings, towers, masts, gates, fences, scaffolding. Chinese fabricators dominate EU imports.
Step 1 -- understand the upstream / fabrication split. Structural fabrication (cutting, drilling, welding, painting) adds <0.1 t CO2/t to the upstream steel. The dominant emissions come from the upstream hot-rolled section, plate or tube.
Step 2 -- request the full chain verification. Fabricators must pass through upstream steel emissions. A fabricator-only emissions report is insufficient.
Step 3 -- handle paint and galvanising correctly. Coatings on structural steel are excluded from CBAM mass. Subtract before applying the emissions factor.
Step 4 -- monitor large-project imports. A 10,000-tonne industrial building import at €0.85/tonne CBAM in 2026 = €8,500. Same project at €8.5/tonne in 2034 = €85,000. Build CBAM into multi-year project budgets.
Frequently asked questions
- What is CN 7308?
- Structures and parts of structures of iron or steel -- bridges, towers, lattice masts, prefabricated buildings, doors, windows.
- Why is CN 7308 so high-volume in CBAM?
- Industrial structures (industrial buildings, towers, telecom masts) are exported to the EU at scale. Chinese supply dominates (~880kt/yr).
Get an emissions cost report for this product
Free PDF with sector defaults, top-3 origin countries and an ETS-linked cost forecast for CN 7308.
Reference data only — confirmed CBAM scope ultimately depends on TARIC declaration and the latest amendments to CBAM Annex I.