Free tool

CN 7308

Structures and parts of structures "e.g., bridges and bridge-sections, lock-gates, towers, lattice masts, roofs, roofing frameworks, doors and windows and their frames and thresholds for doors, shutters, balustrades, pillars and columns", of iron or steel; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, of iron or steel (excl. prefabricated buildings of heading 9406)

✓ In scope of CBAM Iron and steel

CBAM cost preview

Live ETS price: €76.15/t CO₂. Sample: 1 tonne of CN 7308 at default factors costs ~€48.05 in CBAM certificates today.

Direct emissions
6.035 t CO₂/t
Indirect emissions
0.275 t CO₂/t
CBAM cost (1000 t shipment)
€48,051
How is this calculated?

CBAM certificate cost = embedded emissions × ETS price × (1 − free-allocation factor) × phase-in markup.

Phase-in 2026: 10% of full certificate cost. Free allocation assumed 0% in this preview.

Calculate my CBAM cost →

Default embedded emissions

When you cannot collect verified supplier data, the EU lets you use these default values for the Iron and steel sector.

OriginDirect emissionsIndirect emissionsTotal
China6.0356.035
Türkiye5.525.52
Indonesia8.258.25
India5.935.93
Kazakhstan5.365.36

t CO₂e per tonne of product. Source: EU Implementing Reg. 2025/2621 Annex IV.

Top exporters into the EU

Eurostat Comext, latest available year. Volumes shown are extra-EU imports (tonnes).

OriginTonnes / yrShare
China880,00073%
Türkiye320,00027%

Source: Eurostat Comext annual extra-EU trade.

How to comply for this code

Reviewed by AutoCBAM team — last updated 2026-04-28.

Methodology guide -- CN 7308 (structures and parts of structures)

CN 7308 covers prefabricated structural steel: industrial buildings, towers, masts, gates, fences, scaffolding. Chinese fabricators dominate EU imports.

Step 1 -- understand the upstream / fabrication split. Structural fabrication (cutting, drilling, welding, painting) adds <0.1 t CO2/t to the upstream steel. The dominant emissions come from the upstream hot-rolled section, plate or tube.

Step 2 -- request the full chain verification. Fabricators must pass through upstream steel emissions. A fabricator-only emissions report is insufficient.

Step 3 -- handle paint and galvanising correctly. Coatings on structural steel are excluded from CBAM mass. Subtract before applying the emissions factor.

Step 4 -- monitor large-project imports. A 10,000-tonne industrial building import at €0.85/tonne CBAM in 2026 = €8,500. Same project at €8.5/tonne in 2034 = €85,000. Build CBAM into multi-year project budgets.

Frequently asked questions

What is CN 7308?
Structures and parts of structures of iron or steel -- bridges, towers, lattice masts, prefabricated buildings, doors, windows.
Why is CN 7308 so high-volume in CBAM?
Industrial structures (industrial buildings, towers, telecom masts) are exported to the EU at scale. Chinese supply dominates (~880kt/yr).

Get an emissions cost report for this product

Free PDF with sector defaults, top-3 origin countries and an ETS-linked cost forecast for CN 7308.

Reference data only — confirmed CBAM scope ultimately depends on TARIC declaration and the latest amendments to CBAM Annex I.