免费工具

CN 7302

Railway or tramway track construction material of iron or steel, the following : rails, check-rails and rack rails, switch blades, crossing frogs, point rods and other crossing pieces, sleepers "cross-ties", fish-plates, chairs, chair wedges, sole plates "base plates", rail clips, bedplates, ties and other material specialised for jointing or fixing rails

✓ 受 CBAM 管控 Iron and steel

CBAM 成本预览

当前 ETS 价格:€76.15/t CO₂。示例:按默认因子计算,1 吨 CN 7302 今日约需 €49.35 的 CBAM 证书。

直接排放
6.205 t CO₂/t
间接排放
0.275 t CO₂/t
CBAM cost (1000 t shipment)
€49,345
如何计算?

CBAM 证书成本 = 嵌入排放 × ETS 价格 × (1 − 免费配额系数) × 过渡期调整。

Phase-in 2026: 10% of full certificate cost. Free allocation assumed 0% in this preview.

计算我的 CBAM 成本 →

默认嵌入排放

若无法取得经核证的供应商数据,欧盟允许 Iron and steel 行业的进口商使用这些默认值。

来源国直接排放间接排放Total
China6.2056.205
Indonesia8.218.21
India5.455.45
Türkiye5.365.36
Kazakhstan5.185.18

每吨产品的 t CO₂e. Source: EU Implementing Reg. 2025/2621 Annex IV.

对欧盟主要出口国

Eurostat Comext 最新可用年份。展示的是欧盟外进口量(吨)。

来源国吨 / 年占比
China88,000100%

Source: Eurostat Comext annual extra-EU trade.

该编码的合规要点

经 AutoCBAM 团队人工审核 — 最近更新 2026-04-28。

Methodology guide -- CN 7302 (railway track material)

Rail steel is highly specialised, with stringent metallurgical requirements (high carbon, controlled alloy). Production is BF-BOF dominated globally; per-tonne CBAM cost is similar to other heavy steel sections.

Step 1 -- handle the small market carefully. Rail steel has a small set of qualified suppliers (Voestalpine, NSSC, Steel of West Virginia, Saarstahl). Emissions data is generally available and verified -- procurement teams should expect supplier transparency.

Step 2 -- monitor for tenders. Rail tenders are infrastructure-scale. CBAM cost is non-trivial at 5-10kt order sizes; build it into procurement budgets.

常见问题

What is CN 7302?
Railway or tramway track construction material -- rails, switches, sleepers, fishplates. Specialised heavy steel sections.

获取该产品的排放-成本报告

免费 PDF,含 CN 7302 行业默认值、前 3 大来源国与 ETS 关联成本预测。

仅供参考 — 实际 CBAM 范围以 TARIC 申报和 CBAM 附件 I 最新修订为准。