Free tool
CN 7302
Railway or tramway track construction material of iron or steel, the following : rails, check-rails and rack rails, switch blades, crossing frogs, point rods and other crossing pieces, sleepers "cross-ties", fish-plates, chairs, chair wedges, sole plates "base plates", rail clips, bedplates, ties and other material specialised for jointing or fixing rails
✓ In scope of CBAM Iron and steel
CBAM cost preview
Live ETS price: €76.15/t CO₂. Sample: 1 tonne of CN 7302 at default factors costs ~€49.35 in CBAM certificates today.
- Direct emissions
- 6.205 t CO₂/t
- Indirect emissions
- 0.275 t CO₂/t
- CBAM cost (1000 t shipment)
- €49,345
How is this calculated?
CBAM certificate cost = embedded emissions × ETS price × (1 − free-allocation factor) × phase-in markup.
Phase-in 2026: 10% of full certificate cost. Free allocation
assumed 0% in this preview.
Calculate my CBAM cost → Default embedded emissions
When you cannot collect verified supplier data, the EU lets you use these default values for the Iron and steel sector.
| Origin | Direct emissions | Indirect emissions | Total |
|---|
| China | 6.205 | — | 6.205 |
| Indonesia | 8.21 | — | 8.21 |
| India | 5.45 | — | 5.45 |
| Türkiye | 5.36 | — | 5.36 |
| Kazakhstan | 5.18 | — | 5.18 |
t CO₂e per tonne of product. Source: EU Implementing Reg. 2025/2621 Annex IV.
Top exporters into the EU
Eurostat Comext, latest available year. Volumes shown are extra-EU imports (tonnes).
| Origin | Tonnes / yr | Share |
|---|
| China | 88,000 | 100% |
Source: Eurostat Comext annual extra-EU trade.
How to comply for this code
Reviewed by AutoCBAM team — last updated 2026-04-28.
Methodology guide -- CN 7302 (railway track material)
Rail steel is highly specialised, with stringent metallurgical requirements (high carbon, controlled alloy). Production is BF-BOF dominated globally; per-tonne CBAM cost is similar to other heavy steel sections.
Step 1 -- handle the small market carefully. Rail steel has a small set of qualified suppliers (Voestalpine, NSSC, Steel of West Virginia, Saarstahl). Emissions data is generally available and verified -- procurement teams should expect supplier transparency.
Step 2 -- monitor for tenders. Rail tenders are infrastructure-scale. CBAM cost is non-trivial at 5-10kt order sizes; build it into procurement budgets.
Frequently asked questions
- What is CN 7302?
- Railway or tramway track construction material -- rails, switches, sleepers, fishplates. Specialised heavy steel sections.
Get an emissions cost report for this product
Free PDF with sector defaults, top-3 origin countries and an ETS-linked cost forecast for CN 7302.
Reference data only — confirmed CBAM scope ultimately depends on TARIC declaration and the latest amendments to CBAM Annex I.