CN 7308

Structures and parts of structures "e.g., bridges and bridge-sections, lock-gates, towers, lattice masts, roofs, roofing frameworks, doors and windows and their frames and thresholds for doors, shutters, balustrades, pillars and columns", of iron or steel; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, of iron or steel (excl. prefabricated buildings of heading 9406)

✓ Vom CBAM erfasst Iron and steel

CBAM-Kostenvorschau

Aktueller ETS-Preis: €76.15/t CO₂. Beispiel: 1 Tonne KN 7308 kostet bei Standardfaktoren heute ~€48.05 an CBAM-Zertifikaten.

Direkte Emissionen
6.035 t CO₂/t
Indirekte Emissionen
0.275 t CO₂/t
CBAM cost (1000 t shipment)
€48,051
Wie wird das berechnet?

CBAM-Zertifikatskosten = eingebettete Emissionen × ETS-Preis × (1 − Freizuteilungsfaktor) × Einführungs-Markup.

Phase-in 2026: 10% of full certificate cost. Free allocation assumed 0% in this preview.

CBAM-Kosten berechnen →

Standard-Emissionswerte

Wenn keine verifizierten Lieferantendaten vorliegen, dürfen Importeure für den Sektor Iron and steel diese Standardwerte verwenden.

HerkunftDirekte EmissionenIndirekte EmissionenTotal
China6.0356.035
Türkiye5.525.52
Indonesia8.258.25
India5.935.93
Kazakhstan5.365.36

t CO₂e pro Tonne Produkt. Source: EU Implementing Reg. 2025/2621 Annex IV.

Wichtigste Exporteure in die EU

Eurostat Comext, letztes verfügbares Jahr. Angegeben sind die Extra-EU-Importmengen (Tonnen).

HerkunftTonnen / JahrAnteil
China880,00073%
Türkiye320,00027%

Source: Eurostat Comext annual extra-EU trade.

So setzen Sie diesen Code konform um

Vom AutoCBAM-Team geprüft — zuletzt aktualisiert 2026-04-28.

Methodology guide -- CN 7308 (structures and parts of structures)

CN 7308 covers prefabricated structural steel: industrial buildings, towers, masts, gates, fences, scaffolding. Chinese fabricators dominate EU imports.

Step 1 -- understand the upstream / fabrication split. Structural fabrication (cutting, drilling, welding, painting) adds <0.1 t CO2/t to the upstream steel. The dominant emissions come from the upstream hot-rolled section, plate or tube.

Step 2 -- request the full chain verification. Fabricators must pass through upstream steel emissions. A fabricator-only emissions report is insufficient.

Step 3 -- handle paint and galvanising correctly. Coatings on structural steel are excluded from CBAM mass. Subtract before applying the emissions factor.

Step 4 -- monitor large-project imports. A 10,000-tonne industrial building import at €0.85/tonne CBAM in 2026 = €8,500. Same project at €8.5/tonne in 2034 = €85,000. Build CBAM into multi-year project budgets.

Häufige Fragen

What is CN 7308?
Structures and parts of structures of iron or steel -- bridges, towers, lattice masts, prefabricated buildings, doors, windows.
Why is CN 7308 so high-volume in CBAM?
Industrial structures (industrial buildings, towers, telecom masts) are exported to the EU at scale. Chinese supply dominates (~880kt/yr).

Emissions- und Kostenbericht erhalten

Kostenloses PDF mit Sektorstandardwerten, Top-3 Herkunftsländern und ETS-gekoppelter Kostenprognose für KN 7308.

Nur Referenzdaten — der endgültige CBAM-Anwendungsbereich richtet sich nach der TARIC-Anmeldung und der aktuellen Fassung von CBAM Anhang I.